If you live in the city of edmonton a permit is not required if the deck you are building is less than 0 6 metres high and if it is entirely built in the back yard.
City of edmonton deck regulations.
It does not exceed 2 feet 0 6 m in height.
Effective august 1 2020 wearing a mask or face covering is mandatory in all indoor public places and public vehicles.
If you are building a rear deck lower then 24 in height uncovered you do not need to apply for a permit in edmonton.
Compliant with setback regulations stated in section 44 of the zoning bylaw 12800.
Not located on a corner lot.
Does not have a roof or walls.
Entirely located within a back or side yard.
Canada residential rail height and dimensions guards are required when then deck is 24 60 cm above grade.
You do not require an edmonton deck permit or prior authorization if you are planning on building a deck that meets all three of the following criteria.
By permitech on november 15 2016.
It also has to be compliant with the city s zoning bylaws ensuring that it is following rules and regulations for the development of land in edmonton.
You can also contact lot grading at the city 1 780 496 5576 these guys were actually very helpful in answering a lot of my questions.
If you are building a deck in the city of edmonton you may require a deck permit.
For structures not attached to a house and containing a roof or walls see detached garage and shed.
I contacted city s lot grading department who advised to ensure land surveyor shows the new deck on your final grade survey.
Nominal imperial dimensions are listed.
Deck guard foundation deck guard is non climbable between 5 35 above surface no gaps greater than 100mm 4 in or under the deck guard guard height minimum 0 9m 36 lumber.
Effective august 1 2020 wearing a mask or face covering is mandatory in all indoor public places and public vehicles.
The deck can be built before final grade survey.
Learn more at edmonton ca covid 19.
Less than 0 6 metres 24 inches above the ground at every point.
The minimum height of the railing varies based on the height of the deck.
Permits development and construction current page navigation skip to content.
City of edmonton deck permits.
5 4 decking on joist support 16 on centre or 1 decking on joist support 24 on centre.
Ensure minimum clearance of 3 5 m 11 6 above deck walking surface to electrical wires.
Fully situated in the rear yard.
Any deck supporting a hot tub or other extraordinary load requires alberta engineer stamped design for all deck and all connections including ledger board connection to house wall.
However not all decks require a development permit or a building permit.